Landscape Processes
Permit Procurement Process
13 min
sign contract with client eliminate from plans what you do not need draw details of items that the permit department will need pool drawing simplified and engineering pool drawing showing fencing and alarms arbor and deck details and engineering bring check and authorization form wall and footing details cross sections if needed homeowner association approvals if needed set back requirements equipment locations grade changes oak trees and drip line, other trees wucols if needed driveway materials for pasadena electrical and gas permit info consider bringing 3d plans { "columns" \[ { "id" "1", "name" "doing ", "items" \[] }, { "id" "2", "name" "testing", "items" \[] }, { "id" "3", "name" "done", "items" \[] } ] } la county permit additional items grading show drains invert and intake elevations show hardscape vs permeable surfaces and calculations all items on draw details the permit department will need check google earth for changes that may not have been permitted (date change) check at least weekly to see status of permits (put outlook reminder) inform client weekly of status (put outlook reminder)
